Sumitomo Electric Lightwave cuts inventory write-offs 98%
98%
Reduction in annual inventory write-offs following the material flow initiative.
$250,000
Approximate annual inventory write-offs in dollars before the initiative.
$4,000
Approximate annual inventory write-offs in dollars after the initiative.
At a glance
Client
Sumitomo Electric Lightwave
Industry
Manufacturing
Our role
Transform material flow
Our solution
Sustainable inventory control
Scenario
Growth increased inventory complexity
As manufacturing activity, inventory volume and storage requirements increased, Sumitomo Electric Lightwave saw an opportunity to strengthen material flow and inventory management across its fiber-optic communications operations. High-value optical fiber regularly moved between production areas and storage locations, making timely material visibility increasingly important to efficient operations and continued growth.
Inventory management relied in part on the knowledge and experience of long-tenured employees, as well as manual processes developed to support day-to-day operations. Materials held in some external locations and trailers were tracked primarily through paper-based processes rather than receiving the same ERP visibility as other inventory. Materials could therefore be available within the organization but take significant employee time to locate.
Inventory transactions also weren’t always completed consistently, and system records didn’t always reflect material movements accurately. In some instances, materials were reordered even though the required inventory was already somewhere on-site. During annual physical inventory counts, materials that could not be located contributed to approximately $250,000 in write-offs.
Sumitomo Electric Lightwave wanted to address the issue at its source by:
- Improving material visibility
- Reducing inventory losses, search time and write-offs
- Standardizing material flow processes
- Strengthening inventory management discipline
- Using more of its existing Microsoft Dynamics 365 capabilities.
Approach
Creating accountability for every part
Sumitomo Electric Lightwave partnered with MCA Connect’s Strategic Services team to evaluate material flow and identify opportunities to improve operational performance. The team brings manufacturing and distribution veterans with decades of hands-on operating experience.
During a four-week engagement, the team worked alongside warehouse personnel, manufacturing leaders and operational stakeholders to understand how materials moved throughout the business. Rather than treating the inventory challenge as a technology issue, the engagement concentrated on operational execution and the processes supporting it.
The team from Grant Thornton and MCA Connect:
- Mapped material flows
- Documented inventory locations and movement patterns
- Identified process breakdowns and unnecessary waste
- Defined repeatable inventory management processes
- Established leadership accountability and standard work
- Developed a prioritized roadmap for continued improvement
Every material needed a defined location, a consistent transaction path and an accountable owner. “A place for every part” became the operating standard, reducing reliance on individual knowledge and making inventory easier to identify, locate, transact and manage.
To reinforce adoption, the team created tablet-based standard work for warehouse, inventory, receiving and production activities. Leadership monitoring, issue tracking and transaction monitoring processes made the improvements sustainable over time.
At the same time, MCA Connect’s Managed Services team worked closely with SEL to:
- Improve Dynamics 365 inventory and warehouse processes
- Expand mobile capabilities
- Optimized location management
Incorporate previously unmanaged storage locations into the inventory process
Result
Inventory write-offs fell more than 98%
The combination of stronger material flow processes, clearer accountability and improved use of Dynamics 365 produced a significant financial outcome. Before the engagement, Sumitomo Electric Lightwave incurred approximately $250,000 in write-offs during its annual physical inventory count. Following the material flow initiative, annual write-offs dropped to approximately $4,000, representing a reduction of more than 98%.
The benefits extended beyond the reduction in write-offs. Sumitomo Electric Lightwave:
- Gained better visibility into high-value optical fiber inventory
- Reduced the time employees spent searching for materials
- Improved inventory accuracy
- Made inventory transactions more consistent
- Strengthened inventory management discipline
- Improved accountability across inventory-intensive processes
- Reduced dependence on individual knowledge
- Became grounded in repeatable, sustainable processes.
The strategic services assessment generated improvements that were reflected within the same inventory cycle. By addressing material flow, operational discipline, leadership accountability and Dynamics 365 utilization together, the engagement treated the underlying operational conditions rather than focusing only on inventory counts or system configuration.
“The financial results were significant,” said Sumitomo Vice President of Operations Kevin Mistele, “but the lasting value came from establishing a stronger operational foundation for future growth.”
Connect with our team
Content disclaimer
This Grant Thornton Advisors LLC content provides information and comments on current issues and developments. It is not a comprehensive analysis of the subject matter covered. It is not, and should not be construed as, accounting, legal, tax, or professional advice provided by Grant Thornton Advisors LLC. All relevant facts and circumstances, including the pertinent authoritative literature, need to be considered to arrive at conclusions that comply with matters addressed in this content.
Grant Thornton Advisors LLC and its subsidiary entities are not licensed CPA firms.
For additional information on topics covered in this content, contact a Grant Thornton Advisors LLC professional.
Ready to talk? We’re ready to listen.
Request a meeting and a member of our team will be in touch to see what we can do to meet your needs.
Want to submit an RFP? Please submit your request through our RFP submission page.